An inspector’s accuracy has been assessed as follows: p 1 = 0.94 and p 2 = 0.80. The inspector is…
An inspector's accuracy has been assessed as follows: p1 = 0.94 and p2 = 0.80. The inspector is Riven the task of inspecting a batch of 200 parts and sorting out the defects from good units. If the actual defect rate in the batch is q = 0.04, determine: (a) the expected number of Type I and (b) Type II errors the inspector will make. (c) What is the expected fraction defect rate that the inspector will report at the end of the inspection task?