W2 Project Assignment “Project Week 2”
For these project assignments throughout the course you will need to reference the data in the ROI Excel spreadheet. Download it here.
Using the ROI data set:
- For each of the 2 majors calculate the mean, median, minimum, maximum, range, and standard deviation for the columns ‘Cost’ and ’30-Year ROI’.
- By hand or with Excel, for each of the 2 majors calculate the probability that a college picked from the column for ‘School Type’ is ‘Private’.
- By hand or with Excel, for each of the 2 majors find the probability that a college with the ‘School Type’ ‘Private’ has a ’30-Year ROI’ between $1,500,000 and $1,800,000.
Grading Criteria Assignments | Maximum Points |
Meets or exceeds established assignment criteria | 40 |
Demonstrates an understanding of lesson concepts | 20 |
Clearly presents well-reasoned ideas and concepts | 30 |
Uses proper mechanics, punctuation, sentence structure, and spelling | 10 |