Manufacturing Plant Network Setup
Assignment 2 Grading Criteria |
|
Provided an executive summary of the project including all parts of the report. | |
Explained the potential success of the project including advantages in the areas of saving money, saving time, and potential future IT projects. | |
Included details about the types of individual computers that will be installed (brand, RAM, CPU, etc.). | |
Included information and details about other types of hardware that will be required for the installation (routers, printers, etc.). | |
Included information about the server to be used and how it will connect internally to the network. | |
Added information about how the network will connect to the Internet (firewall, monitoring service, connection type, etc.). | |
Provided the timeline for the project to be successful that integrates all portions of the work breakdown structure. | |
Used correct spelling, grammar, and professional vocabulary. |